TRAINING FOR THE PREPARATION OF CLOSED DRAINAGE CHANNEL WORK BUDGET PLANS IN BENDUNG KELURAHAN, KASEMEN DISTRICT, SERANG CITY

Authors

  • Darmawan Pontan Universitas Trisakti
  • Martinus Bambang Susetyarto Universitas Trisakti
  • Indrawati Sumeru Universitas Trisakti
  • Suradjin Sutjipto Universitas Trisakti

DOI:

https://doi.org/10.53067/ije2.v3i1.103

Keywords:

Drainage, Channel, Cost, Budget, Plan

Abstract

In every planning of construction work, both facilities and infrastructure, of course requires budget planning, quality and time. Mastery of civil engineering knowledge in calculating budget requirements and costs correctly in its implementation needs to be supported by the competence of the experts who plan it, especially the estimator who calculates it. There are many cases where the budget value and the cost of the proposed work are not in accordance with the engineering drawing plans, building material specifications, and the ability of the workforce in the field. Therefore, the planning of the Budget and Cost Plan (RAB) for closed drainage canal works in the neighborhood around Kelurahan Bendung, Kecamatan Kasemen, Kota Serang needs to be carried out accurately, and more adequately, according to the purpose of the construction of the work. In order for the community to have the ability to effectively and efficiently prepare the RAB for the Regional Government, the FTSP PKM Team of Trisakti University took the initiative to organize socialization activities for the preparation of the RAB as a basis for submitting a budget for the construction of a closed drainage canal project in the neighborhood around the office of Kelurahan Bendung. This activity is intended to be able to provide technical knowledge on how to make cost estimates in accordance with the guidelines of the Indonesian National Standard (SNI), in accordance with the analysis of work unit prices, and in accordance with the Domestic Component Level (TKDN), so that the calculation results are expected to be effective, efficient, and close to the actual implementation. This technical knowledge is very useful for people who want to make, or/and supervise the implementation of drainage canal works around their own homes

Downloads

Download data is not yet available.

References

AHS SNI 2017-2018 Lingkup Pekerjaan Arsitektur dan Sipil.

Anonim, Analisa Upah dan Bahan (Analisa BOW), Bumi Aksara, Jakarta, 1990;

Bachtiar Ibrahim, Rencana dan Estimate Real of Cost, Bumi Aksara, Jakarta, 2001;

Diktat kuliah Perencanaan dan Pengendalian Proyek dan Konstruksi

Daftar Harga Bahan Bangunan dari lapangan

Iman Soeharto, Manajemen Proyek, Erlangga, Jakarta, 1995;

Jurnal Daftar Harga Bahan Bangunan, Edisi 39 tahun 2020.

Malangjoedo, S, AV 41 (SU41), Syarat-syarat Umum untuk pelaksanaan Bangunan Umum, BP Pekerjaan Umum, Jakarta, 1978 ;

Mukomuko, JA, Dasar Penyusunan Anggaran Biaya Bangunan, Kurnia Esa, Jakarta, 1976;

Peurivoy D.S, and Oberlender, G.D., Estimating Construction Costs, 4th Ed., McGraw-Hill Book, New York, 1992;

Ritz, G.J., Total Constraction Project Management, I’ntl Ed., McGraw-Hill Book, Singapore, 1994.

Smith, N.J., Project Cost Estimating, Thomas Telford, London, 1995;

SNI 2835-2008 Tata cara perhitungan harga satuan pekerjaan tanah

SNI 03-6966-2003 Spesifikasi Saluran Air Hujan Pracetak Berlubang untuk Lingkungan Permukiman.

Sunggono, Rencana Anggaran Biaya, Nova, Bandung,

Soedradjat, Analisa Anggaran Biaya Pelaksanaan, Nova, Bandung, 1982;

Downloads

Published

2023-04-30

How to Cite

Pontan, D. ., Susetyarto, M. B. ., Sumeru, I. ., & Sutjipto, S. . (2023). TRAINING FOR THE PREPARATION OF CLOSED DRAINAGE CHANNEL WORK BUDGET PLANS IN BENDUNG KELURAHAN, KASEMEN DISTRICT, SERANG CITY. International Journal of Engagement and Empowerment (IJE2), 3(1), 111–117. https://doi.org/10.53067/ije2.v3i1.103